Why we build
in steel.
Every Kozzie home is built on a solid steel frame. Here is what that means for a home you intend to keep.

Every Kozzie home is a permanent dwelling.
A Kozzie home sits on permanent, engineered foundations, such as screw piers, designed for your site. That is different from a home on wheels, which is built to be towed rather than fixed to the ground. The rules that apply to each type of home differ by state and council, so confirm what applies where your land is.
Whether a home achieves Class 1a status is subject to building approvals.
A solid steel frame
The solid steel frame is the structure of every Kozzie home, built indoors in the factory.
- Structural Integrity — Engineered for strength and stability during transport.
- Relocatable Design — Can be moved and reinstalled at another location.
Termite resistance
A solid steel frame is not food for termites, and that applies wherever in Australia your home is built. It removes the structure of the home from the risk.
Timber elements inside a Kozzie home — skirtings, joinery, door jambs — are still detailed and protected to Australian standards. The difference is that the frame holding the roof up is never at risk.
Superior Thermal Insulation
Our homes incorporate high-quality insulation and thermal breaks to help maintain comfortable indoor temperatures year-round, from Australia's hottest summers to its coldest winters.
Steel conducts heat more readily than timber, which is why thermal breaks matter in a steel-framed wall.
- High-quality insulation
- Thermal breaks
- Triple glazing
Structural Integrity
Steel does not warp, twist or shrink, important for a home that is trucked and craned into place.
Fire and Wind Resistance
Non-combustible steel framing, engineered for structural strength and wind resistance.
Made to Exceed Standards, Sustainable Future
Precision-engineered steel construction delivers lasting structural strength while steel's recyclability supports a more sustainable future.
The honest limitations
Steel is not automatically better than timber. It is better in specific conditions, and worse if it is built badly:
- Without thermal breaks, a steel-framed wall underperforms a timber one. Ask any supplier to show you theirs in writing.
- In aggressive coastal or soil environments, the corrosion-protection specification matters and should be documented.
- Timber is renewable and stores carbon; both materials have a defensible environmental case.
We build on a solid steel frame because our homes are trucked and craned into place, because termites are a risk across Australia, and because a consistent frame suits a factory process.
Built in a factory. Lifted into place.


Photographs: Unit Lab factory and site.
Your Home.
Your Unique Building Identification Number.
Every Kozzie home has its own unique Building Identification Number (BIN). Use your BIN and the link we give you to follow photos of your own home during construction, rather than waiting until handover. Your home's build record follows six stages, in order.
Stage 01 of 6
Framing
The solid steel frame of your home is built and assembled in the factory.
- Solid steel frame built
- Floor, wall and roof structure assembled
- Frame ready for insulation and thermal breaks
Stage 02 of 6
Insulation and Thermal Bridging
High-quality insulation is fitted and thermal breaks are added to limit thermal bridging through the steel frame.
- High-quality insulation fitted
- Thermal breaks added to the frame
- Walls, floor and ceiling
Stage 03 of 6
Exterior
The ceramic-coated cladding and glazing go on. Waterproofing and tiling are completed in Korea.
- Ceramic-coated cladding
- Glazing installed
- Waterproofing and tiling completed in Korea
Stage 04 of 6
Electrical
Electrical conduits and draw wires are installed in the factory. Australian electrical wiring and fit-off follow.
- Conduits installed in the factory
- Draw wires installed in the factory
- Australian wiring and fit-off to follow
Stage 05 of 6
Plumbing
Pipework is installed in the factory. Plumbing fit-off and service connections are completed in Australia.
- Pipework installed in the factory
- Plumbing fit-off completed in Australia
- Service connections completed in Australia
Stage 06 of 6
Finishes
Joinery, fixtures and interior finishes are completed, including a Murphy bed where applicable.
- Joinery and fixtures
- Interior finishes
- Murphy bed, where applicable